Parking Lot Sealing and Striping
Sealcoating and line striping done together in the same project, so your commercial parking lot reopens protected, freshly striped, and looking new.
At C&C Super Seal, sealing and striping is the most common maintenance package we provide for commercial parking lots: shopping centers, strip malls, office parks, warehouses, industrial sites, dealerships, apartment communities, churches, schools, and more. We inspect and prep the lot, take care of any repairs first, and spray on a commercial-grade sealer. Once the sealcoat has cured, we restripe the parking lot according to the project specs - whether that's using the existing layout, creating a new one, or adding updates.
We are a family owned and operated commercial asphalt contractor based in Bensalem, PA, and sealcoating is in our name. We have been sealing and striping lots across Philadelphia, Bucks County, Montgomery County, and South Jersey since 1998. Because we also repair, pave, and mill asphalt, we know when a lot is ready to seal and when it needs a repair first.
- 20+ Years
Experience - Licensed
& Insured - Family Owned
& Operated - Since
1998
Free seal and stripe quote
Call now, or fill out the form and a team member will reach out to you.
Call (267) 223-9906 Request a QuoteWhy Seal and Stripe Together
Sealcoating is an important step in protecting and getting the most out of your asphalt, but when it is sprayed on it covers the old lines and pavement markings.
That means a sealed lot needs to be striped again, so the two services are done in the same project. The sealer protects the asphalt from sun, water, oil, gas, and salt and restores the black finish, and fresh striping on top of it gives you crisp parking lines, ADA spaces, fire lanes, and arrows that read clearly against the new surface.
- Done in the same projectSealing and striping completed together, scheduled around your hours.
- Lines that bond to the new surfaceLatex traffic paint on the cured sealer.
- Avoid unnecessary downtimeThe lot is closed once instead of twice, and it reopens ready for customers.
- Cost effective, one quoteRepairs, sealing, and striping listed as their own line items so you can decide what to include.
The Sealcoating
Inspected, repaired, cleaned, and spray-applied with a commercial-grade sealer.
Sealcoating needs a nice and clean asphalt surface to properly bond to, so the first step is to clean up the asphalt using blowers and burn off things like heavy oil spots. Crack sealing and pothole repair are taken care of before the sealer goes down. Then, when everything is ready, the hot sealcoating is sprayed on. The number of coats depends on the project, and the sealer cures in 18 to 36 hours.
- Inspect the asphalt and make repairs
- Clean the surface with blowers and burn off heavy oil spots
- Hot sealcoating applied
- Number of coats depending on the project
The Line Striping
Parking spot lines, ADA parking spaces, fire lanes, directional arrows, stop bars, crosswalks, and more, applied after a freshly sealcoated parking lot.
Once our sealcoating process is finished and the sealer on the asphalt has fully cured, we are ready to begin striping the parking lot. In this scenario we can either stick to the existing layout, make updates, or make complete changes depending on your project. We can bring in new additions like EV charging, curbside pickup, and more. Posts and signs, as well as parking stones, can also be installed. As a full service asphalt contractor, we can complete the full project.
- Restripe to the existing layout, or create a new layout
- ADA handicap parking spots
- Fire lanes, no parking zones, and directional arrows
- Drive-thru markings, EV charging, curbside pickup, and more
Repair, Seal, Stripe
Repairs come first so the sealer goes on sound pavement. Striping comes after so the lot reopens finished. All of it completed in the same project.
1. Pothole and Crack RepairCracks hot-sealed and potholes cut out and patched with hot mix before the sealer goes down. Optional, but recommended.
2. SealcoatingInspected, prepped, cleaned, and sprayed with a commercial-grade sealer, cured in 18 to 36 hours.
3. Line StripingStalls, ADA spaces, fire lanes, arrows, and stencils laid out fresh on the cured sealer.
From Your First Call to a Finished Lot
Most commercial lots are sealed, striped, and reopened in two to three days, scheduled around your hours.
- Reach outCall or send the request form with the property address.
- On-site quoteWe walk and measure the lot, note any repairs it needs, confirm the layout, and send a written quote.
- Schedule around youNights, weekends, or phased sections so the property stays in service.
- Prep and sealInspect, repair, clean, burn off oil spots, then spray on the sealer and let it cure.
- Stripe and reopenLines chalked and squared on the cured sealer and painted, and the lot can reopen the same day.
Areas We Serve
Based in Bensalem, PA, with a regular service area of roughly 40 miles in every direction.
We seal and stripe commercial lots in Philadelphia and Bucks, Montgomery, Chester, and Delaware counties in Pennsylvania, across central and South Jersey from Trenton and Camden out to the shore at Toms River, and in northern Delaware around Wilmington. For larger properties and multi-site portfolios we travel further out.
- Bensalem, PA, home base
- Philadelphia
- Bucks County, PA
- Montgomery County, PA
- Chester and Delaware counties
- Central and South Jersey
- Northern Delaware
- Further out for larger projects
What Customers Say
Rated Excellent on Google by the property owners and managers we work for.
Great group of guys. Very professional and a very good quality job.
We had a last minute project, Chris came out same day and gave us an estimate. He gave us a great price and completed the job the next day. Good price and job was completed neat and quickly. Would definitely recommend.
A very neat and detail oriented company, would definitely recommend!
Fast, dependable, and very respectful. Amazing work, thanks C&C!
Other Services We Offer
When a lot needs more than sealing and striping, the same crew handles it.
Pothole and Crack RepairHot rubberized crack sealing and pothole patching.
Thermoplastic StripingLong-life roadway markings, crosswalks, and stop bars.
Asphalt PavingParking lots, mill and overlay, roadways, and municipal paving.
Bollards and SignageSteel bollards, ADA signs, and parking lot signage.
Request a Free, No Obligation Seal and Stripe Quote
Call (267) 223-9906 or fill out the form and we will walk the lot, confirm the layout, and quote it.
Sealing and Striping Questions
Why do sealing and striping go together?
Sealcoating covers the old lines completely, so a sealed lot has to be restriped. Doing both in the same project avoids unnecessary downtime and is more cost effective, and paint applied to fresh sealer bonds better and looks sharper than lines added to a weathered lot later.
How long is the lot closed?
The sealer needs 18 to 36 hours to cure, depending on temperature, humidity, and sun. Striping goes on after that and dries in under an hour, so most lots are back in full use in two to three days. Larger lots are sealed and striped in sections so part of the property stays open.
Can you stripe the same day you seal?
Not on the same surface. The sealer has to cure before paint goes on it, so striping is typically the next day or the day after. On large lots sealed in phases, one section can be striped while another is being sealed.
Can I change the layout when the lot is restriped?
Yes, and a freshly sealed lot is the best time to do it. The old lines are gone, so a new layout, added spaces, angled stalls, one-way aisles, EV or curbside pickup spaces, and updated ADA parking can be laid out without blacking out anything.
How often should a commercial lot be sealed and striped?
Every two to three years for most commercial lots in our region. Heavy traffic, plowing, and salt push a lot toward two years. Striping on its own is usually refreshed every one to two years between seal coats.
What paint do you use on a sealed lot?
Latex traffic paint on freshly sealcoated lots so it bonds to the new surface. Oil-based alkyd paint is used when we restripe existing asphalt that has not been sealed.
Do you repair cracks and potholes first?
We recommend it. Sealer protects the surface but does not fill it, so crack sealing and pothole repair before sealcoating keeps the finished lot sound. It is optional and quoted as its own line item.
What about ADA spaces and signs?
Accessible spaces, access aisles, and pavement symbols are laid out to the current standard or to your project specifications when the lot is restriped. Upright signs and posts can be supplied and installed with the striping if you want them.
What weather do you need?
A dry surface, temperatures of at least 50 degrees and rising, and no rain for about 24 hours after the sealer goes down. In our region that makes the sealing season roughly late April through October. We reschedule rather than seal or stripe ahead of weather.
Can I get just one or the other?
Yes. We offer sealcoating and line striping on their own as well. Striping is also the finish on every lot we pave.
How much does sealing and striping cost?
It depends on the size of the parking lot, the repairs and prep it needs, and the number of stalls and markings. Every project is different, so we measure and quote based on the project requirements, with repairs, sealing, and striping listed as their own line items.
Do you seal and stripe residential driveways?
No. We work on commercial properties only: parking lots, strip malls, shopping centers, office parks, warehouses, industrial sites, dealerships, apartment communities, churches, and schools.
Ready to Seal and Stripe Your Lot?
Fill out the form with the necessary information and someone will reach out to you, or call us directly and speak to one of our team members now.









